Cutting Edge Flood Mitigation
Cutting Edge was originally designed to be above the flood level set following the construction of Wivenhoe Dam. In 2011, this level was exceeded with water entering the car park and ground floor of the building. In 2022, the Jane Street building saw a lesser flood event however this still caused significant damage.
View Article