
Mass Engineered Timber Structures | Timber Tower
The Timber Tower is an experimental project that is the first non-residential building in Australia to use locally grown and manufactured mass engineered timber. The 5-level structure was erected in less than a month and the building, including the integrated fitout for 90 staff was completed within 7 months. It is also the first tall building to utilise CLT as the primary vertical structure. This increases the column free useable floor area with the added benefit of providing a more solid façade thereby providing a very efficient building envelope. The resulting effect of exposed timber structure, smaller intimate column free floor plates, and generous windows produces a completely new typology for the commercial office.
View Article